Difference between revisions of "Portal:Featured Article Of The Week"

From Asylum Projects
Jump to: navigation, search
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{FAformat
 
{{FAformat
|Title= Chicago State Hospital
+
|Title= Big Spring State Hospital
|Image= Chicago.jpg
+
|Image= TXbigspringaerial.png
 
|Width= 150px
 
|Width= 150px
|Body= The old insane department was of brick, with small barred windows, iron doors, and heavy wooden doors outside, with apertures and hinged shutters for passing food. The cells were about seven by eight feet; they were not heated, except by a stove in the corridor, which did not raise the temperature in some of them above freezing point; the cold, however, did not freeze out the vermin with which the beds, walls, and floors were alive. The number of cells in this department was 21, 10 on the lower floor and 11 on the upper floor; many of them contained two beds,
+
|Body= The 45th Texas Legislature authorized the construction of Big Spring State Hospital in 1937 to serve the people of the West Texas area. The city donated the 577 acres, which at the time was valued at $51,400 and philanthropist Dora Roberts guaranteed a permanent water supply. Governor James V Allred placed the facility in Big Spring because of the need for a psychiatric hospital in West Texas. Ground was broken in January 1938, and the hospital opened 18 months later in June 1939. Within six months, the hospital treated 402 patients, most of whom were transferred from other state facilities.
  
The other buildings were all frame; they were more like barns or barracks-immense areas of bare floors, crowded with cheap iron strap bedsteads. The heating was insufficient; there was no ventilation; the arrangements for bathing were so imperfect, there is no hot water, that during the winter months, the inmates were not bathed; even in summer the number of tubs was too small and they were inconveniently located. There were no halls in these buildings, the entire space is divided into rooms; the stairways were either outside or in the center of the room.
+
The original eight buildings designated as the general hospital were the administration building, including professional and administrative staff living quarters; the employees building, which included housing for direct care and clerical staff; the men's receiving hospital; the women's receiving hospital; the psychiatric hospital; the laundry; the power house; and the supply building. A railroad spur was located west of the supply building in order for the transportation and delivery of hospital supplies.
  
In the report for 1878 it is stated that the Cook County poorhouse: is a rookery and should be torn down." John G. Cochrane, the architect, drew the plans for additional buildings for the infirmary, and the county adopted the designs he submitted on the 22d of September, 1881.  [[Chicago State Hospital|Click here for more...]]
+
Five additional buildings were constructed on campus within the next 10 years at a cost of $778,000. Improvements to the grounds and the addition of equipment brought the total hospital investment to $1,060,571. Today, the hospital physical plant includes 25 buildings.  [[Big Spring State Hospital|Click here for more...]]
 
}}
 
}}

Revision as of 04:36, 28 May 2023

Featured Article Of The Week

Big Spring State Hospital


TXbigspringaerial.png

The 45th Texas Legislature authorized the construction of Big Spring State Hospital in 1937 to serve the people of the West Texas area. The city donated the 577 acres, which at the time was valued at $51,400 and philanthropist Dora Roberts guaranteed a permanent water supply. Governor James V Allred placed the facility in Big Spring because of the need for a psychiatric hospital in West Texas. Ground was broken in January 1938, and the hospital opened 18 months later in June 1939. Within six months, the hospital treated 402 patients, most of whom were transferred from other state facilities.

The original eight buildings designated as the general hospital were the administration building, including professional and administrative staff living quarters; the employees building, which included housing for direct care and clerical staff; the men's receiving hospital; the women's receiving hospital; the psychiatric hospital; the laundry; the power house; and the supply building. A railroad spur was located west of the supply building in order for the transportation and delivery of hospital supplies.

Five additional buildings were constructed on campus within the next 10 years at a cost of $778,000. Improvements to the grounds and the addition of equipment brought the total hospital investment to $1,060,571. Today, the hospital physical plant includes 25 buildings. Click here for more...