Editing Porterville State Hospital

From Asylum Projects
Jump to: navigation, search

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision Your text
Line 6: Line 6:
 
| caption =  
 
| caption =  
 
| established = 1945
 
| established = 1945
| construction_began = 1950
+
| construction_began =  
 
| construction_ended =
 
| construction_ended =
 
| opened = 1953
 
| opened = 1953
Line 14: Line 14:
 
| building_style = [[Cottage Planned Institutions|Cottage Plan]]
 
| building_style = [[Cottage Planned Institutions|Cottage Plan]]
 
| architect(s) =
 
| architect(s) =
| location = Porterville, CA
+
| location =
 
| architecture_style =
 
| architecture_style =
 
| peak_patient_population =
 
| peak_patient_population =
Line 22: Line 22:
  
 
==History==
 
==History==
In 1945, the State purchased 1,245 acres of land for $62,850 for the future Porterville State Hospital. The site was originally planned for the care and treatment of individuals with epilepsy, but was redesigned as a treatment center for the mentally retarded. Porterville State Hospital opened for service on May 12, 1953, with 200 clients.  When Governor Earl Warren dedicated the facility, there was an estimated audience of 3,000 people and most Porterville businesses closed for the afternoon.  The total population at the facility reached its peak in 1957 with over 2,600 clients. The facility would later be renamed by the Department of Developmental Services to Porterville Developmental Center to better reflect the purpose of the facility that cared for individuals with developmental disabilities.
+
The Porterville State Hospital opened for service on May 12, 1953, with 200 clients.  When Governor Earl Warren dedicated the facility, there was an estimated audience of 3,000 people and most Porterville businesses closed for the afternoon.  The total population at the facility reached its peak in 1957 with over 2,600 clients. The facility would later be renamed by the Department of Developmental Services to Porterville Developmental Center to better reflect the purpose of the facility that cared for individuals with developmental disabilities.
 
 
In November, 2006, construction began for a 96-bed residential expansion in the Secure Treatment Program. The expansion included six 16-bed living residences, a recreation complex and a new reception building. Construction was completed in October, 2009.
 
  
 
[[image:PortervilleCA1956.JPG|300px|left]]
 
[[image:PortervilleCA1956.JPG|300px|left]]

Please note that all contributions to Asylum Projects may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see Asylum Projects:Copyrights for details). Do not submit copyrighted work without permission!

To edit this page, please answer the question that appears below (more info):

Cancel | Editing help (opens in new window)