Editing Brookwood Hospital
From Asylum Projects
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 27: | Line 27: | ||
During the 127 years of its operation, the hospital developed considerably in fabric and infrastructure. Major openings included that of Florence House in 1875, a new chapel seating 800 in 1903, a reception hospital in 1930 and a library and conference centre in 1967. Following opening of the sick hospital in 1938, patient capacity peaked at 1,753. The hospital closed in 1994. | During the 127 years of its operation, the hospital developed considerably in fabric and infrastructure. Major openings included that of Florence House in 1875, a new chapel seating 800 in 1903, a reception hospital in 1930 and a library and conference centre in 1967. Following opening of the sick hospital in 1938, patient capacity peaked at 1,753. The hospital closed in 1994. | ||
− | ==Images of Brookwood Hospital== | + | ===Images of Brookwood Hospital=== |
<gallery> | <gallery> | ||
File:brookwoodaerial.png | File:brookwoodaerial.png |